Project Controls Engineer – Primavera & Project Scheduling Expert

Job Details Experience Needed: 3 to 7 years Career Level: Experienced (Non-Manager) Education Level...

منذ 11 شهر عمل كلي EGYPT 307
قدم الآن
المكان

EGYPT

نوع العمل

عمل كلي

الخبرة

3-5 سنوات

الراتب

غير معروض

الملخص الوظيفي

Job Details

Experience Needed:3 to 7 years
Career Level:Experienced (Non-Manager)
Education Level:Bachelor's Degree
Salary:Confidential

Job Description

  • We are seeking a detail-oriented Project Controls Engineer to join one of the most promising start-up PM offices working in EGYPT,US, Gulf Markets  In this role, you will assist in overseeing contractor submissions, verifying actual progress vs reported updates, and supporting the Engineer’s independent assessments for claims, extensions of time (EOT), and monthly valuations.
  • Key Responsibilities:
  • Prepare, review and comment on the Contractor’s baseline and revised programs using Primavera P6.
  • Prepare progress claims, cost reports, and time impact analysis (TIA) submitted for the Contractor.
  • Verify the Determination of progress claims, cost reports, and time impact analysis (TIA) submitted by the Contractor.
  • Analyze the critical path and identify dependencies between activities.
  • Monitor project progress, identify potential delays, and propose corrective actions.
  • Prepare periodic reports on the project schedule status and its relation to costs.

     

Job Requirements

  • Bachelor’s degree in Engineering, Construction Management, or a related field.
  • 3 to 7 years of proven experience in project controls within the construction industry.
  • Strong proficiency in project scheduling software such as Primavera P6 or MS Project.
  • Familiarity with FIDIC-based contracts is a strong plus.
  • Background in Back-Office PM Companies is a strong plus.
  • Familiarity with Delay Analysis standards including AACE R29.03, SCL protocol,  is a strong plus.
  • Professional Certificates including CLAC, and related planning and Delay Analysis is strongly plus.
  • Excellent written and verbal communication in English.
  • Strong analytical mindset, with attention to contractual and technical details.

    للتقديم الان

وظائف مشابهة

اعلان وظائف شركة القاهرة لتكرير البترول بمسطرد وطنطا

Engineering

اعلان وظائف شركة القاهرة لتكرير البترول بمسطرد وطنطا تطلب مؤهلات عليا - اعلان داخلي رقم 1 لسنة 2020 شركة القاهرة لتكرير البترول الإدارة العامة للشئون الإدارية تحريراً في 2 / 1 / 2020 إعلان داخلي رقم (...

الموقع
غير مصنفة
نوع العمل
غير محدد
سنين الخبرة
0-3
الراتب
لم يذكر

وظائف حكومية مهندسين وفنين خدمات مساحية بالهيئة المصرية العامة للمساحة

Engineering

وظائف حكومية مهندسين وفنين خدمات مساحية بالهيئة المصرية العامة للمساحة حديثي التخرج بكل المحافظات مهندس ثالث (تعاقد) بكالوريوس هندسة مدني عدد الأشخاص المطلوبين للوظيفة 35 فني خدمات مساحية رابع (تعاقد)...

الموقع
غير مصنفة
نوع العمل
غير محدد
سنين الخبرة
0-3
الراتب
لم يذكر